1.11.6 Removal of Switch Box

Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
1
Remove the 2 mounting
screws on the switch
box cover.
2
Remove the 1 mounting
screw on the terminal
block cover.
3
Disconnect each
connector
(7 connectors in total)
connected to the inside
of the switch box.
Transfer connector x
3 pieces
Direct connector x 4
pieces
Part 5 – Disassembly and Maintenance
Procedure
Switch box cover
Heat exchanger
Drain pump
temperature
thermistor
Float switch
Swing motor
Disassembly and Maintenance
Terminal block box
cover
remote control
Moisture sensor
remote control
For power
Moisture sensor
supply
Swing motor
connection
1
Points
3
5
5
5–31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents