Faq100B - Daikin R-410A Service Manual

Sky-air indoor
Hide thumbs Also See for R-410A:
Table of Contents

Advertisement

Wiring Diagrams
4.14

FAQ100B

1 1
Wiring diagram
3
4
5
1–86
The illustration below shows the wiring diagram of the unit.
In case of simultaneous
operation system
Indoor unit
Indoor unit
(Master)
(Slave)
remote control
to Outdoor
Unit
Control box
Notes
1.
: Terminal
: Connector
: Field wiring
2.
3. In case using central remote control, connect it to the unit in accordance with the
attached installation manual.
4. X24A is connected when the infrared remote control kit is being used.
5. remote control model varies according to the combination system, confirm
engineering materials and catalogs, etc. before connecting.
6. Symbols show as follows:
RED : Red
BLK : Black
WHT : White
YLW : Yellow
ORG : Orange
GRY : Gray
PRP : Purple
BLU : Blue
7. Confirm the method of setting the selector switch (SS1, SS2) by installation
manual and engineering data, etc.
8. X15A, X25A are connected when the drain up kit is being used. Connect it to the
kit in accordance with the attached installation manual.
ESIEN05-04
Wired remote
control
Note 4
Norm.
Emg.
Receiver / Display unit
Part 1 – System Outline

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents