7.2.5 To lower the switch box of the indoor unit and remove the top cover

Installer reference guide
84
NOTICE
Do NOT damage or remove the foam sealing of the switch box.
3 Disconnect the ground connection from the top cover of the switch box.
During the installation, you will need access to the inside of the indoor unit. To
have easier front access, lower the switch box of the unit as follows:
Prerequisite: The user interface panel has been removed.
1 Loosen the screws.
2 Lift up the switch box.
3 Lower the switch box.
ERLA11~16D + EBSH/X(B)11+16P30+50D
Daikin Altherma 3 R ECH₂O
4P663482-1C – 2023.05