Setting The Centralized Group No - Daikin R-410A Service Manual

Sky-air indoor
Hide thumbs Also See for R-410A:
Table of Contents

Advertisement

ESIEN05-04
3.9

Setting the Centralized Group No.

When?
If you want to carry out centralized control with a central remote control and a unified ON/OFF
controller, you have to set the group No. for each group with the remote control.
Wired remote
The illustration below shows the wired remote control.
control
Second Code N°
Setting
To set the "Centralized group No.", proceed as follows:
Step
1
2
3
4
5
6
7
Individually
If the address must be set individually for each unit, set the "Mode No." to "30". For example, for power
address setting
consumption counting.
Part 4 – Commissioning and Test Run
UNIT No.
Unit N°
First Code N°
GROUP
4
3
1
7
Action
Switch ON the power supply of the central remote control, the unified ON/OFF controller
and the indoor unit(s).
Hold down the INSPECTION/TEST button for at least 4 s during normal mode to enter
the "Field setting mode".
Press the TEMPERATURE CONTROL button until "Mode No." "00" appears.
Press the INSPECTION/TEST button to inspect the group No. display.
Set the "Group No." for each group by pressing the PROGRAMMING TIME button.
The "Group No." rises in the order of 1—00, 1—01, ..., 1—15, 2—00, ..., 2—15, 3—00,
etc.
The unified ON/OFF controller however displays only the range of group numbers
selected by the switch for setting each address.
Press the CONFIRMATION button to enter the selected group No.
Press the INSPECTION/TEST button to return to normal mode.
Mode N°
SETTING
6
5
2
Field Settings
1
3
Field set mode
4
5
4–27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents