Positioning The Boiler - REMEHA Quinta Pro 30 Installation And Service Manual

Wall-hung gas condensing boilers
Table of Contents

Advertisement

Quinta Pro 30 - 45 - 65 - 90 - 115
4.4

Positioning the boiler

1
2
3
4
5
09/06/2011 - 123157-AF
The boiler is delivered with a mounting template.
A suspension clamp situated at the rear of the casing enables the
boiler to be directly suspended on the mounting bracket.
1. Position the mounting template to the wall with adhesive tape.
CAUTION
4
4
2. Drill 2 holes with a Ø of 10 mm.
3. Insert the rawplugs with a Ø of 10 mm.
4. Attach the mounting bracket to the wall with the provided bolts with
a Ø of 10 mm.
5. Hang the boiler on the mounting bracket.
T001540-A
Using a spirit level, check that the mounting axis is
perfectly horizontal.
During mounting, cover up the connection points for
the air supply and the combustion gas exhaust, to
protect the boiler and its connections from dust. Only
remove this protection at the time when these
connections are made.
4. Installation
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents