10.2 Checklist For Periodic Inspection And Maintenance - REMEHA Quinta Pro 30 Installation And Service Manual

Wall-hung gas condensing boilers
Table of Contents

Advertisement

Quinta Pro 30 - 45 - 65 - 90 - 115

10.2 Checklist for periodic inspection and maintenance

Inspection and/or service activities
1
Checking the hydraulic pressure (Recommendation:
1,5 to 2 bar)
2
Checking the tightness of the flue gas evacuation and air
inlet connections
3
Checking the automatic air vent
4
Checking the safety valve
5
Checking the siphon
6
Checking the ionization current
7
Checking the burner and heat exchanger (central
heating)
8
Inspection of the ionization electrode/ignition electrode
9
Assembling the boiler (Replace all removed gaskets)
10 Filling and refitting the syphon
11 Checking combustion (CO
12 Number of operating hours
13 Number of successful starts (%)
14 Service message deleted or service indicator reset
15 Maintenance kit A, B or C used
16 Boiler visually inspected
17 Extra maintenance work that was undertaken
18 Confirmation of inspection
Date
Company name, signature of engineer
09/06/2011 - 123157-AF
) (Full load/Part load)
2
Confirmation and date
(dd-mm-yy) (dd-mm-yy) (dd-mm-yy) (dd-mm-yy) (dd-mm-yy)
10. Checklists
87

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents