The pump must be connected to standard control PCB (PCU). To do
this, proceed as follows:
1. Connect the cable, that is delivered with the boiler, to the pump.
T002047-B
2. Remove the grommet from the opening in the middle of the base
of the boiler. Pass the pump connection cable through the base of
the boiler and seal the opening again by tightening the bayonet
fitting to the cable.
1
2
3
T002048-A
3. Connect the pump connection cable to the cable in the instrument
box that is connected with connector X8.
X8
T002050-C