Quinta Pro 30 - 45 - 65 - 90 - 115
4
Installation
4.1
Regulations governing installation
4.2
Package list
09/06/2011 - 123157-AF
WARNING
The engineer must be Gas Safe registered and have the
correct ACS qualifications.
Installation of the appliance must be done by a qualified
engineer in accordance with prevailing local and national
regulations.
4.2.1.
Standard delivery
The delivery includes:
4 The boiler, fitted with a connection cable
4 Connection cable for pump
4 Mounting rail and mounting accessories for wall mounting
4 Mounting template
4 Installation and Service Manual
These installation and maintenance instructions deal only with the
items included in a standard delivery. For installation and assembly
of any accessories supplied with the boiler, see the relevant
installation/assembly instructions.
4.2.2.
Accessories
Description
Remeha Celcia 10 on/off thermostat
Remeha qSense basic modulating control system
Remeha iSense extended modulating control system
Cascade controller
Outside temperature sensor
Flue kit
Combustion gas adapter 80/80 (Quinta Pro 30/45)
Combustion gas adapter 100/100 (Quinta Pro 65/90/115)
Calorifier tank
Kit for connection to the water heater
DHW sensor
Modulating pump
4. Installation
15