Concluding Steps - Fujitsu PRIMERGY BX924 S4 Upgrade And Maintenance Manual

Server blade
Table of Contents

Advertisement

Main memory
8.3.4

Concluding steps

Perform the following procedures to complete the task:
Ê If applicable, reinstall the air cowls as described in section
cowls" on page
Ê If applicable, reinstall the mezzanine carrier as described in section
"Installing mezzanine cards" on page
Ê Close the server blade as described in section
page
56.
Ê Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page
Ê If applicable, close the rack door as described in section
door" on page
Ê If available, update the system board BIOS to the latest version as described
in section
"Updating or recovering the system board BIOS and iRMC" on
page
73.
Ê Enable boot watchdog functionality as described in section
watchdog functionality" on page
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
166
170.
62.
91.
Upgrade and Maintenance Manual
134.
"Closing the server blade" on
84.
"Installing the air
57.
"Closing the rack
"Enabling boot
"Enabling
BX924 S4