Average Task Duration - Fujitsu PRIMERGY BX924 S4 Upgrade And Maintenance Manual

Server blade
Table of Contents

Advertisement

Before you start
2.2

Average task duration

Average task duration: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
Refer to
table 1 on page 24
calculating the average task duration:
Step
Server shutdown
System unit
removal,
disassembly
Transport
Maintenance
procedures
Transport
Assembly, system
unit installation
Starting up
Table 1: Calculation of the average task duration
24
for an overview of steps taken into account for
included
Explanation
Shutdown time depends on hardware and
software configuration and may vary
significantly.
no
Software tasks necessary before
maintenance are described in section
"Starting the maintenance task" on
page
Making the server blade available,
yes
removing the server blade from the system
unit
Transporting the server blade to the service
no
table (where required) depends on local
customer conditions.
Maintenance procedures including
yes
preliminary and concluding software tasks
Returning the server blade to its installation
no
site (where required) depends on local
customer conditions.
Reassembling the server blade, installing
yes
the server blade in the system unit
Booting time depends on hardware and
no
software configuration and may vary
significantly.
Upgrade and Maintenance Manual
63".
BX924 S4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents