Concluding Steps - Fujitsu PRIMERGY BX924 S4 Upgrade And Maintenance Manual

Server blade
Table of Contents

Advertisement

Figure 123: Installing the system board (B)
Ê Secure the system board with the screw (M3 x 6 mm, C26192-Y10-C68)
(see circle).
I
Screw torque: 0.6 Nm (not applicable for the Japanese market)
Ê Verify the settings on the new system board (jumpers and/or switch).
I
For a detailed description, please refer to section
on page

10.5.5 Concluding steps

Ê If applicable, reinstall the air cowls as described in section
memory air cowls" on page
Ê Reinstall all remaining system board components as shown in the related
sections:
– Mezzanine cards with carrier: refer to section
cards" on page 134
I
Install all expansion cards into their original slots.
– TPM (if applicable): refer to section
Ê Close the server blade as described in section
page
56.
BX924 S4
279.
170.
Upgrade and Maintenance Manual
System board components
"Onboard settings"
"Installing mezzanine
"Installing the TPM" on page 243
"Closing the server blade" on
"Handling of
269

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents