Concluding Steps - Fujitsu PRIMERGY BX924 S4 Upgrade And Maintenance Manual

Server blade
Table of Contents

Advertisement

7.2.4

Concluding steps

Perform the following procedures to complete the task:
Ê Close the server blade as described in section
page
56.
Ê Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page
Ê Update the firmware as described in section
firmware" on page
Ê In order to configure a mezzanine card that has been installed or replaced,
the card's Option ROM has to be enabled in the system board BIOS. For
SAN / iSCSI boot the card's Option ROM has to be enabled permanently. If
applicable, proceed as described in section
page
80.
Ê Enable boot watchdog functionality as described in section
watchdog functionality" on page
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
Ê If applicable, restore LAN teaming configurations as described in section
"After replacing / upgrading LAN/CNA controllers" on page
BX924 S4
78.
84.
91.
Upgrade and Maintenance Manual
Mezzanine cards
"Closing the server blade" on
"Updating mezzanine card
"Enabling Option ROM scan" on
"Enabling boot
94.
57.
"Enabling
139

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents