Removing The Hot-Swap Power Supply Cage - IBM System x3100 M4 Type 2582 Problem Determination And Service Manual

Type 2582
Hide thumbs Also See for System x3100 M4 Type 2582:
Table of Contents

Advertisement

3. Connect one end of the power cord into the connector on the back of the power
4. Make sure that both the ac and dc power LEDs on the rear of the power supply
5. If you are adding a power supply to the server, attach the redundant power

Removing the hot-swap power supply cage

This procedure applies only to the 5U server model with hot-swap power supplies
(Model name: 2582-F4x).
Release
lever
Hot-swap
power supply
supply and connect the other end of the power cord into a properly grounded
electrical outlet.
are lit, indicating that the power supply is operating correctly.
information label that comes with this option on the server top cover near the
power supplies.
XXXW ~ AC
XXXW ~ AC
1
xxx-xxx/
xxx-xxxV~
x,x/x,x A
xx/xx Hz
2
xxx-xxx/
xxx-xxxV~
x,x/x,x A
xx/xx Hz
Chapter 5. Removing and replacing server components
247

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents