Section 3: Fixed Flap Linkage Installation - Hangar 9 B25J Mitchell ARF Assembly Manual

Fly first class
Table of Contents

Advertisement

Section 3: Fixed Flap Linkage Installation

Required Parts
Required Tools and Adhesives
Note: The following steps cover the
installation of fixed flaps on your
B-25 Mitchell. You can skip to
installing operational flaps.
Step 1
Remove the covering from the wing slot to insert the fixed
flap stay in the wing.
20
Step 2
Sand the flap stay using medium grit sandpaper. Use
rubbing alcohol and a paper towel to remove any dirt and
debris from the flap stay. This will help in strengthening
the bond between the flap stay and wing rib.
Step 3
Use 30-minute epoxy to glue the flap stay in the wing.
Step 4
Cut two 1/4-inch (4mm) long pieces from the heat shrink
tubing and slide it onto each of the clevises. Thread the
clevises onto the flap linkage.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B-25 mitchell arf

Table of Contents