Hangar 9 B25J Mitchell ARF Assembly Manual page 67

Fly first class
Table of Contents

Advertisement

Section 13: Tail Section Installation
Step 8
Mix up 1/2-ounce (15Ml) of 30-minute epoxy. Apply the
epoxy to the exposed wood of the stabilizer. The stabilizer
should then be bolted into place. Refer to Step 4 for
details Use paper towels and rubbing alcohol to remove
any excess epoxy from the fuselage and stabilizer. Allow
the epoxy to fully cure before proceeding.
Step 9
Position the servo in the opening with the servo arm
facing the front of the fuselage. Mark the locations for the
servo mounting screws using a felt-tipped pen.
66
Step 10
Use a drill and 1/16-inch (1.5mm) drill bit to drill the
locations for the servo mounting screws.
Step 11
Apply a few drops of thin CA to each of the holes drilled
in the previous step. This will help harden the wood,
making the screws more secure in their placement.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B-25 mitchell arf

Table of Contents