Hangar 9 B25J Mitchell ARF Assembly Manual page 30

Fly first class
Table of Contents

Advertisement

Step 12
Slide the cowling onto the nacelle and align the opening
in the dummy engine with the propeller adapter of the
motor. Temporarily tape the cowl into place.
Step 13
Drill four locations for the mounting screws using a
1/16-inch (1.5mm) drill bit. Drill the holes centered
in the card stock and approximately 1/8-inch (3mm) back
from the end of the template to guarantee drilling into
the hardwoood positioned behind the raised areas of
the nacelle.
Section 5: Electric Motor Installation
Step 14
Apply a few drops of thin CA to each of the holes drilled
in the previous step. This will help harden the wood,
making the screws more secure in their placement.
Step 15
Secure the cowling to the engine nacelle using four
Step 16
Repeat Steps 1 through 14 for the remaining
motor installation.
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B-25 mitchell arf

Table of Contents