Hangar 9 B25J Mitchell ARF Assembly Manual page 46

Fly first class
Table of Contents

Advertisement

Step 4
From the back side of the mounting rails, insert the four
4-40 blind nuts and use a 4-40 bolt with a washer to draw
each blind nut into each one of the four holes you just
drilled.
Step 5
Install the recommended ball link studs onto the nose
wheel steering arms. The pull-pull cables will be hooked
up to these ball links in a later step.
Note: Be sure and use threadlock
on all metal-to-metal fasteners.
Section 8: Retractable Landing Gear Installation
Step 6
Install 16 inches (406mm) of each color of air line onto
each of the air cylinder inlets on the landing gear. Feed the
two air lines through the two 1/8-inch (3mm) holes and
into the radio compartment. These air lines will be hooked
up later using the Robart air line diagram which we have
included on page 73 of this manual)
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B-25 mitchell arf

Table of Contents