Cases When Switchover Occurs - Altigen MAXCS ACC 6.5 Administration Manual

Maxcs acc system
Table of Contents

Advertisement

Chapter 26: Redundancy Configuration
Figure 1. Redundancy topology
To realize the shared IP addresses, each Softswitch server needs two network
integration cards (NIC cards) set up, one for sharing and another for redundancy control
and system maintenance. A single redundancy IP address should be assigned to the
redundancy NIC card. All redundancy NIC cards and KAB control NIC cards are
connected by network Switch 2.
A single IP address should be assigned to the sharing NIC card. All external services,
including gateways, VM service, Logger Service, recording service and IP phones, and
CT applications should try to contact the shared IP address through network Switch 1.
This network is bridged by the KAB to either the primary or secondary server.
Switch 1 and Switch 2 are linked to one another directly.

Cases When Switchover Occurs

In the following cases, MAXCS will switch control of the system from the active
Softswitch to the standby Softswitch:
The button Manual Switch Over is clicked in the Redundancy Administration dialog
box (see "Manually Switching Over" on page 375).
The active system crashes or is shut down or restarted, and Automatically assume
control when active system is not available is selected in the Redundancy dialog
box of the standby system (see Figure 2 on page 367).
364
MAXCS ACC 6.5 Administration Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Max communication server acc 6.5

Table of Contents