Editing The Meter Settings - Roland RSS M-300 Owner's Manual

Live mixing console
Table of Contents

Advertisement

Metering

Editing the meter settings

In the METER SETUP popup you can change the level detection
point of the meter, and make peak hold settings.
Accessing the METER SETUP popup
1.
Press [METER] to access the METER screen.
fig.ScrMeter.eps
2.
Press [F6 (METER SETUP)] to access the METER SETUP
popup.
ffig.ScrMeterSetupGuide.eps
1
2
1
CH METERING POINT selection buttons
Use these to select the level detection point for the CH
meters.
You can also make the setting for changing the level detection
point from a USER button (p. 136).
2
BUS
METERING POINT selection buttons
Use these to select the level detection point for the AUX/
MTX/MAIN meters.
You can also make the setting for changing the level detection
point from a USER button (p. 136).
3
OVER Lev knob
This adjusts the level at which the OVER indication of the
meter will light, in a range of -18 dB–0 dB.
4
PEAK HOLD button
This turns the meter's peak hold function on/off.
5
HOLD TIME knob
This sets the duration that the meter's peak hold or OVER
indication will stay lit, in a range of 1 sec–4 sec or CONTINUE.
Meter peak hold is enabled only when the PEAK HOLD
96
3
4
5
button is on.
If CONTINUE is selected, the indication will remain until you
execute the PEAK CLEAR operation (by pressing a function
button) in the METER screen, etc.
The function buttons have the following operations:
[F8 (CLOSE)]
Closes the popup.
The METERING POINT setting you make in the METER SETUP
popup will apply to the top panel meters, the meters in the
METER screen, the channel meters in the CHANNEL DISPLAY
screen, the MONITOR screen, and the meters in the
TALKBACK/OSC screen.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents