Mitsubishi Melsec-Q QD75P1 User Manual page 446

Programmable logic controller q-series
Hide thumbs Also See for Melsec-Q QD75P1:

Advertisement

11 MANUAL CONTROL
Forward run JOG start signal
[Y8, YA, YC, YE]
Reverse run JOG start signal
[Y9, YB, YD, YF]
BUSY signal [XC, XD, XE, XF]
Md. 26 Axis operation status
Pulse output to an
external source (PULSE)
Positioning operation
Positioning complete signal
[X14, X15, X16, X17]
JOG operation timing and processing time
The following drawing shows details of the JOG operation timing and processing
time.
ON
OFF
OFF
ON
OFF
t1
Standing by
In JOG operation
t3
OFF
Fig. 11.5 JOG operation timing and processing times
Normal timing times
t1
t2
1.0 to 3.0
0 to 1.8
Delays may occur in the t1 timing time due to the operation status of other axes.
t2
t4
Standing by
Unit: ms
t3
2.7 to 4.4
0 to 1.8
11 - 6
MELSEC-Q
t4