Download Print this page

Mitsubishi Melsec-Q QD75P1 User Manual page 254

Programmable logic controller q-series
Hide thumbs Also See for Melsec-Q QD75P1:

Advertisement

6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL
Positioning start signal
[Y10, Y11, Y12, Y13]
BUSY signal
[XC, XD, XE, XF]
Start complete signal
[X10, X11, X12, X13]
Md. 26 Axis operation status
Output pulse to external source
(PULSE)
Positioning operation
OPR request flag
[ Md. 31 Status: b3]
OPR complete flag
[ Md. 31 Status: b4]
Machine OPR operation timing and process time
t1
Waiting
In OPR
t2
Fig. 6.9 Machine OPR operation timing and process time
Normal timing time
t1
t2
1.0 to 1.4
2.7 to 4.4
The t1 timing time could be delayed depending on the operating conditions of
the other axis.
t4
Waiting
t3
Unit: ms
t3
0 to 1.8
0 to 1.8
6 - 34
MELSEC-Q
t4

Advertisement

loading

This manual is also suitable for:

Melsec-q qd75p2Melsec-q qd75p4Melsec-q qd75d1Melsec-q qd75d4Melsec-q qd75d2Qd75p1 ... Show all