Front Panel Led Assembly - HP ML570 - ProLiant - G2 Setup And Installation Manual

Hp proliant ml570 generation 2 server setup and installation guide
Hide thumbs Also See for ML570 - ProLiant - G2:
Table of Contents

Advertisement

Figure 7-7: Cable routing of the Remote Insight
Lights-Out Edition (16-pin)

Front Panel LED Assembly

The server includes a front panel LED assembly that connects directly to the system
board. For instructions on converting the front panel LED assembly from a tower
configuration to a rack configuration, refer to the HP ProLiant ML500 Series
Generation 2 Servers Chassis Conversion Guide.
HP ProLiant ML570 Generation 2 Server Setup and Installation Guide
Cabling the Server
7-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml570 g2

Table of Contents