3. Align the new hot-plug hard drive with the drive bay, and slide the hard drive
into the bay until seated (1).
4. Push in the drive ejector lever until it locks the hard drive in place (2).
Figure 3-50: Installing a hot-plug hard drive
5. Repeat steps 2 through 4 to install additional hard drives.
6. Be sure that the hot-plug hard drive activity LEDs on the front of the system are
illuminated green, indicating that the system is functioning properly. For detailed
information on LEDs, refer to Appendix C, "System LEDs and Switches."
7. If any of the LEDs indicates an error, refer to Appendix D, "Troubleshooting," or
refer to the troubleshooting guide for instructions.
8. If you have a tower-model server, close the front bezel door.
9. Run the ROM-Based Setup Utility or Smart Array Controller Utility to configure
the new hard drives.
HP ProLiant ML570 Generation 2 Server Setup and Installation Guide
Installing Hardware Options
3-59