Server Installation Guidelines; Connecting The Ac Power Cord And Peripheral Devices - HP ML570 - ProLiant - G2 Setup And Installation Manual

Hp proliant ml570 generation 2 server setup and installation guide
Hide thumbs Also See for ML570 - ProLiant - G2:
Table of Contents

Advertisement

Installing the Tower Server
The following illustration shows the server in a standard tower configuration.
Figure 6-1: ProLiant ML570 Generation 2 tower server

Server Installation Guidelines

Follow the guidelines in Chapter 2, "Planning the Server Installation," to plan an
optimum environment and to install the server properly and safely. Be aware of all
server warnings listed in the chapter and throughout this guide.
Install any optional hardware components before installing and powering up the
server for the first time. Refer to Chapter 3, "Installing Hardware Options," for
instructions on installing PCI expansion boards and other major hardware options.
IMPORTANT: Use the SmartStart CD to install option drivers.
Connecting the AC Power Cord and Peripheral
Devices
After all internal hardware options have been installed in the server, connect external
power supplies and peripheral devices to the connectors located on the rear panel of
the server. Icons on the back of the server identify the function of each connector.
6-2
HP ProLiant ML570 Generation 2 Server Setup and Installation Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml570 g2

Table of Contents