Installing the Rack Server
5. Release the rail compression lever (1) to seat the locking mechanism in the
square hole in the vertical rack post (2).
Figure 5-4: Releasing the rail compression lever
6. Repeat steps 2 through 5 for the right rack rail assembly.
HP ProLiant ML570 Generation 2 Server Setup and Installation Guide
5-9