This chapter provides information and instructions for planning the installation of the
server. Figure 2-1 illustrates multiple servers installed in a rack.
Figure 2-1: ProLiant ML570 Generation 2 servers
installed in a rack
The following sections describe the server and site preparation required to correctly
and safely install the server. This preparation includes:
•
Optimum environment considerations
•
Rack planning resources
•
Rack warnings and cautions
•
Server warnings and cautions
HP ProLiant ML570 Generation 2 Server Setup and Installation Guide
Planning the Server Installation
2
2-1