Attaching The Server Rails - HP ML570 - ProLiant - G2 Setup And Installation Manual

Hp proliant ml570 generation 2 server setup and installation guide
Hide thumbs Also See for ML570 - ProLiant - G2:
Table of Contents

Advertisement

Attaching the Server Rails

To attach the server rails to the server chassis:
IMPORTANT: Install the server rails with the smooth side of the rail against the server
chassis.
1. Align the four keyholes on the server rail with the four posts on the side of the
server chassis.
2. Press the rail against the side of the chassis and slide it toward the front of the
server until the rail snaps into place.
Figure 5-6: Positioning the server rail on the chassis
3. Repeat steps 1 and 2 to attach the second rail to the server.
HP ProLiant ML570 Generation 2 Server Setup and Installation Guide
Installing the Rack Server
5-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml570 g2

Table of Contents