Installing the Rack Server
3. Lift the locking bar on the cable management arm and swing the arm away from
the server to gain full access to the thumbscrews.
4. Align the cable management arm to the cable management arm bracket and
tighten the two thumbscrews to attach the arm to the bracket.
Figure 5-16: Attaching the cable management arm to
the cable management arm bracket
Reinstalling the Power Supplies
To reinstall your power supplies, reverse the procedure "Removing the Power
Supplies" in this chapter.
5-20
HP ProLiant ML570 Generation 2 Server Setup and Installation Guide