2 Installing the server into the pedestal kit

Required tools

There are no tools required for installing the pedestal kit.

Remove the rails from the server

If your server has rails when you receive it, you need to remove the rails before mounting it in
the pedestal kit. To remove the component:
1.
Slightly pull the rail lock away from the rail to unlock the rail. See
2.
Slide the rail toward the front of the server to disengage the rail from the posts on the server.
3.
Repeat these steps for the rail on the other side of the server.
Figure 2-1 Removing the rails from the server
Figure 2-1 (page
9).