Installing the Server in a Rack
Installing the Server in the Rack
To complete the server rack installation:
•
Load the server into the rack rails.
•
Attach the cable management system reel assemblies.
•
Reinstall the power supplies.
Loading the Server into the Rack Rails
CAUTION: To avoid destabilizing the rack, install servers starting from the bottom of
the rack.
To install the server in the rack:
1. Pull the inner slide rail forward from each rack rail assembly until it locks into
place (1).
2. Slide the inner bearing race forward until it stops (2).
Figure 8-7: Locking the inner slide rails into place
8-10
HP ProLiant DL580 Generation 2 Server Setup and Installation Guide