CHAPTER 4

Site Preparation

Site Preparation Checklist for J-EX4200 Switches

Table 23: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure distance between external power
sources and switch installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of switches you
want to install.
Rack or Cabinet
Site Preparation Checklist for J-EX4200 Switches on page 57
General Site Guidelines for J-EX Series Switches on page 59
Site Electrical Wiring Guidelines for J-EX Series Switches on page 59
Environmental Requirements and Specifications for J-EX Series Switches on page 60
The checklist in Table 23 on page 57 summarizes the tasks you need to perform when
preparing a site for J-EX4200 switch installation.
For More Information
"Environmental Requirements and
Specifications for J-EX Series
Switches" on page 60
"Power Specifications for J-EX4200
Switches" on page 71
"J-EX4200 Switches Hardware
Overview" on page 3
Performed By
Date
57