Installation; Site Preparation; In The Box; Unpacking The Switch - Dell R1-2401 Getting Started Manual

Poweredge vrtx switch modules
Hide thumbs Also See for R1-2401:
Table of Contents

Advertisement

Installation

Site Preparation

Before installing the switch or switches, make sure that the chosen
installation location meets the following site requirements:
Clearance — There is adequate front and rear clearance for operator
access. Allow clearance for cabling, power connections, and ventilation.
Cabling — The cabling is routed to avoid sources of electrical noise, such
as radio transmitters, broadcast amplifiers, power lines, and fluorescent
lighting fixtures.
Ambient Temperature — The ambient switch operating temperature
range is 10° to 35ºC (50° to 95ºF).
NOTE:
Decrease the maximum temperature by 1°C (1.8°F) per 300 m (985 ft.) above
900 m (2955 ft.).
Relative Humidity — The operating relative humidity is 8% to 85% (non-
condensing) with a maximum humidity gradation of 10% per hour.

Unpacking the Switch

Package Contents
When unpacking each switch, make sure that the following items are
included:
One VRTX switch module
One USB type A-to-DB-9 female cable
Getting Started Guide
Safety and Regulatory Information
Warranty and Support Information
Software License Agreement
D E L L C O N F I D E N T I A L – P R E L I M I N A R Y 1 / 1 6 / 1 4 - F O R P R O O F O N LY
Template Last Updated - 2/7/2007
3
Installation
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

R1-2210

Table of Contents