Installing A Cisco Wave Inline Adapter - Cisco WAVE-574-K9 - Wide Area Virtualization Engine 574 Hardware Installation Manual

Hardware installation guide
Table of Contents

Advertisement

Chapter 4
Installing Hardware Options for the WAVE-574
Caution
Step 4

Installing a Cisco WAVE Inline Adapter

Step 1
Step 2
Step 3
Step 4
OL-17738-01
Do not leave open spaces above or below an installed appliance in the rack
cabinet. To help prevent damage to appliance components, always install a filler
panel to cover the open space and to help ensure proper air circulation. See the
documentation that comes with your rack cabinet for more information.
Connect the cables and power cords. For information on connecting cables and
power cords, see the
"Rack Mounting and Cabling the WAVE-574" section on
page
3-3.
The WAVE-574 can accommodate one optional 2-port Gigabit Ethernet inline
network adapter or one optional 4-port Gigabit Ethernet inline network adapter.
For information about the features of the Cisco WAVE Inline Network Adapter
and its cabling requirements, see
To install a PCI adapter in the riser-card assembly, follow these steps:
Review the information in the
page 2-2
and the
"Safety Guidelines" section on page
Power down the appliance and disconnect all power cords and external cables.
Remove the covers. (See the
Remove the PCI riser-card assembly. (See
Cisco Wide Area Virtualization Engine 574 Hardware Installation Guide
Installing a Cisco WAVE Inline Adapter
Chapter 5, "WAVE Inline Network Adapter."
"Safety Warnings and Cautions" section on
"Removing the Covers" section on page
Figure
4-1.)
2-3.
4-1.)
4-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wide area virtualization engine 574

Table of Contents