The replacement procedure for the core switch blade takes approximately 30 minutes. The following
items are required for the core switch blade replacement:
•
ESD grounding strap
•
Phillips #2 screwdriver
•
Replacement DC04 SAN Director core switch blade (CR4S-8)
How to determine whether or not to replace a core switch blade
The following events might indicate that a core switch blade is faulty:
•
The status LED on the core switch blade is lit amber, or the power LED is not lit.
•
The slotShow command does not show that the core switch blade is enabled.
•
The haShow command indicates an error.
•
Any of the following messages is displayed in the error log:
• Slot unknown message relating to a core switch blade slot
• core switch blade errors or I
• FRU: FRU_FAULTY messages for a core switch blade
• Configuration loader messages or Sys PCI config messages
• Generic system driver messages (FABSYS)
• Platform system driver messages (Platform)
• EM messages that indicate a problem with a core switch blade
• Function fail messages for the core switch blade master
For more information about error messages, refer to the Fabric OS Message Reference.
Removing a core switch blade
The DC04 SAN Director continues to operate while a core switch blade is being replaced.
NOTE:
The CR4S-8 blade is compatible only with the DC04 SAN Director.
To remove a CR blade:
CAUTION:
Wear a grounded ESD strap when handling a CR4S-8 blade. Use the grounding connections above
the power connectors on the chassis.
1.
Remove the chassis door. See
2.
Power off the blade by sliding the slider switch in the left ejector to the right to the off position
(see
Figure
3.
Disconnect cables from the faulty core switch blade.
4.
Unscrew the thumb screw from both ejectors using the Phillips screwdriver.
5.
Open both ejector handles simultaneously to approximately 45 degrees and pull the core switch
blade out of the chassis (see
182
Replacing DC04 SAN Director field-replaceable units (FRUs)
2
C timeouts
"Removing the chassis
68).
Figure
door" on page 169.
68).