Dc San Director Installation; Time And Items Required For Installation; Installation Tasks, Time And Items Required - HP A7533A - Brocade 4Gb SAN Switch Base Hardware Reference Manual

Hp storageworks dc and dc04 san backbone director switches hardware reference guide (5697-7814, february 2009)
Hide thumbs Also See for A7533A - Brocade 4Gb SAN Switch Base:
Table of Contents

Advertisement

2 DC SAN Director Installation

This chapter provides the following information:
• "Time and items required for
• "Site preparation, unpacking the DC
• "Items included with the DC
• "Installing the DC Director in the 14U Rack Mount
• "Powering on the DC
• "Port
numbering" on page 42
• "Managing
• "Using the optional HP StorageWorks DC SAN Backbone Director Inter-Chassis Link (ICL) cable
43

Time and items required for installation

You can set up and install the DC SAN Director in the following ways:
As a standalone unit on a flat surface.
In a 19-in. EIA cabinet, using the 14U Rack Mount Kit (ships with the DC SAN Director).
Table 6
describes the main installation and setup tasks and the estimated installation time, based
on a fully populated DC SAN Director (384 FC ports). Configurations with fewer ports require
less time. These time estimates assume a prepared installation site and appropriate power and
network connectivity.
Table 6 Installation tasks, time and items required
Installation task
Site preparation and unpacking
DC SAN Director
Installing rack mount kit
Mounting and securing DC SAN
Director in rack
Installing power cables and
powering on the DC SAN Director
installation" on page 29
Director" on page 32
Director" on page 42
cables" on page 43
Time estim-
ate
30 minutes
30 minutes
30 minutes
20 minutes
HP StorageWorks DC and DC04 SAN Backbone Director Switches
Director" on page 30
Kit" on page 32
Items required
One 1/2-in. socket wrench (to remove pallet bolts)
One #2 Phillips screwdriver (for cable management
comb)
One pallet jack
One hydraulic lift or assisted lift, able to raise to a
minimum of 140 cm (55 in.), with a minimum capacity
of 113 kg (250 lb). The DC SAN Director weighs
104 kg (228 lb) with eight FC8-48 port cards installed
(384 ports).
See
"Installing the DC Director in the 14U Rack Mount
Kit" on page 32.
Power cables and serial cable (provided in the DC
SAN Director accessory kit)
kit" on page
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae370a - brocade 4gb san switch 4/12

Table of Contents