Table 3-21
ADU Diagnostic Messages
Message
Description
Adapter/NVRAM
EISA nonvolatile RAM has an ID for a
ID mismatch
different controller from the one
physically present in the slot.
Array accelerator
Battery is not fully charged.
battery pack X
not fully charged
Array accelerator
Battery pack on array accelerator is
battery pack X
below required voltage levels.
below reference
voltage
(recharging)
Board in use by
Array accelerator memory is in use
expand operation
by Expand operation.
Board not
Array controller configured for use
attached
with array accelerator board, but one
is not attached.
Configuration
ADU detected that nonvolatile RAM
signature is zero
contains a configuration signature
that is zero. Old versions of the
System Configuration Utility could
cause this.
Configuration
Array accelerator board configured
signature
for a different array controller board.
mismatch
Configuration signature on array
accelerator board does not match the
one stored on the array controller
board.
Controller
Controller communication failure
communication
occurred.
failure occurred
Controller
EISA nonvolatile RAM does not
detected.
contain a configuration for this
NVRAM
controller.
configuration not
present
Controller
Controller firmware is below the
firmware needs
latest recommended version.
upgrading
Controller is
Controller is installed in slot for
located in
special video control signals. If
special "video"
controller is used in this slot, LED
slot
indicators on front panel may not
function properly.
For use with Pentium II and Pentium III Xeon processor-based servers only
continued
Recommended Action
Run the System Configuration Utility.
If 75% of batteries present are fully charged,
array accelerator is fully operational. If less than
75% of batteries are fully charged, allow 36
hours to recharge them.
Allow enough time for batteries to recharge (36
hours). If batteries have not recharged after 36
hours, replace the array accelerator board.
Operate system without array accelerator board
until expand operation completes.
Attach array accelerator board to array
controller.
Run the latest version of System Configuration
Utility to configure the controller and nonvolatile
RAM.
To recognize the array accelerator board, run
the Array Configuration Utility.
ADU was unable to successfully issue
commands to the controller in this slot.
Run the System Configuration Utility to
configure the nonvolatile RAM.
Run Options ROMPaq to upgrade the controller
to the latest firmware revision.
Install the controller in a different slot and run
the System Configuration Utility to configure the
controller and nonvolatile RAM. Then run the
Array Configuration Utility to configure
controller.
Diagnostic Tools 3-39
continued