Novell ADMINSTUDIO 9.5 User Manual page 1579

Hide thumbs Also See for ADMINSTUDIO 9.5:
Table of Contents

Advertisement

The following information is included:
Table 20-17 • Test Results Summary Report Data
Item
Job Name
MSI Name
Product Code
Total tests run on each
machine
Computer Name
Operating System
Start Time
Result
Deployment Tests
Failed
Conflict Tests Failed
Jobs List
AdminStudio 9.5 User Guide
Description
Name of the test-ready package job. Corresponds to the Job Identifier that was
entered on the Web Service URL Panel of the Predeployment Test Preparation
Wizard when this test-ready package was created. Click on this link to view the
Job Summary Report
Name and location of the test-ready
Product GUID of the
package.
The total number of Deployment and Conflict tests associated with this test-ready
package.
Unique identifier of an individual computer in the network.
Operating system of the machine.
Time the installation of the test-ready package started on this machine.
Icon indicating whether the test-ready package installation (and associated tests)
Passed ( ), Failed (
Total number of deployment tests that failed during the installation of the test-
ready package on this computer.
Total number of conflict tests that failed during the installation of the test-ready
package on this computer.
Click to access the
ADS-0950-UG00
Chapter 20: Analyzing Installations Prior to Deployment
for this job.
package associated with this job.
.msi
package that was used to create the test-ready
.msi
), or were Incomplete.
Predeployment Test Results By Job
Predeployment Test Reference
Report.
1579

Advertisement

Table of Contents
loading

Table of Contents