Managing Job Data - Novell ADMINSTUDIO 9.5 User Manual

Hide thumbs Also See for ADMINSTUDIO 9.5:
Table of Contents

Advertisement

Chapter 20: Analyzing Installations Prior to Deployment
Viewing Predeployment Test Results
Report Name
Machine Result Summary
Report

Managing Job Data

After a Predeployment report is created, you can use the Manage Job feature to:
Set a job with a Failed status to a Passed status, and enter a comment to explain why the status was
changed.
Delete the job.
If you click the Manage Job link on a
opens.
On the
Manage Job
the Application Catalog.
Changing the Status of a Job from Failed to Passed
Task:
To change the Job Status of a job:
1.
Open the
Manage Job Page
2.
Select the Override failed test check box in the Job Status area. The job's status is then changed to Failed
(Override to Passed).
1558
Job Summary Report
Page, you can change the Job Status of a job from Failed to Passed or delete the job from
Job Summary Report
opens.
Description
Lists all of the test-ready package
jobs run on a specific machine.
or
or
Job Details Report
for a Failed job and click Manage Job. The
How To View
On the
Predeployment Test
Results By Machine
on a Machine Name link.
Job Details
Report, the
ADS-0950-UG00
AdminStudio 9.5 User Guide
Report, click
Manage Job Page

Advertisement

Table of Contents
loading

Table of Contents