Maintenance; Recommended Overhaul Intervals; Standard Replacement Parts - Edwards STP-XF803 Series Instruction Manual

Turbomolecular pumps
Hide thumbs Also See for STP-XF803 Series:
Table of Contents

Advertisement

6.4

Maintenance

6.4.1

Recommended overhaul intervals

If the STP pump has been used for a long time, accumulation of deposits and deterioration/failure of
the parts may cause the pump to stop running or fail.
To efficiently and safely use the STP pump, periodically conduct an overhaul.
By referring to the overhaul intervals based on the pump conditions of use as shown in the table
below, develop an overhaul plan.
Pump use condition
When deposits have
accumulated
When no deposits have
accumulated but corrosive
gas has been used
When no deposits have
accumulated, and no
corrosive gas has been used
6.4.2

Standard replacement parts

When overhauling pumps, upper and lower touch down bearing, O-rings will be replaced as standard
replacement parts.
Note:
When STP pump and STP control unit detect warning, it is essential to have the touch down
bearings replaced regardless of the recommended overhaul intervals. Refer to the Instruction
Manual for each model for details of warning detection.
STP Series Turbomolecular Pump
Recommended overhaul
interval
1 year
2 years
5 years
Remarks
Processes resulting in large amount
of deposits in the pump will require
more frequent overhaul.
If parts are severely deteriorated due
to corrosive gas, the overhaul
interval needs to be individually set.
6
MT-00E-2A1-C
Page 49

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stp seriesStp-xf1303 series

Table of Contents