A.3 Set-up
Select configure viscosity test from the main menu.
Press spindle and select or scan one of the cone plate
spindles (40, 41, 42, 51, 52).
Confirm you would like to set the gap by pressing Yes.
If the contact light (yellow) is illuminated, turn the
micrometer adjustment ring clockwise (as you look down on
the instrument) until the light is no longer illuminated (see
Figures A-1 and A-6).
If the yellow contact light is not illuminated, slowly turn the
micrometer adjustment ring in small increments (one or two
scale divisions) counterclockwise.
Continue moving the micrometer adjustment ring slowly
counterclockwise until the contact light (yellow) first turns
on. THIS IS THE "HIT POINT."
Adjust the sliding reference marker, right or left, to the
closest full scale division mark (see Figure A-1).
Turn the micrometer adjustment ring one scale division to
the left to meet the line on the sliding reference marker. THE
YELLOW CONTACT LIGHT SHOULD GO OFF.
You have established the gap space needed for
measurement. Press ok.
Carefully remove the sample cup.
Note:
The cup may be removed and replaced without
resetting the gap if the micrometer adjustment ring has
not been moved.
Remove the spindle from the rheometer when cleaning.
Re-establish the hit point every time the spindle is
attached/detached.
M19-2101 REVISION 2.0
D V N E X T R H E O M E T E R - O P E R AT I O N A L M A N U A L
Figure A-5
Figure A-6
89