After completing the Pre-installation Checklist on page 4, use the following installation checklist to guide you
through the steps of the system installation.
Hardware Installation
Installation Steps
1. Flush all fluid lines to remove the debris and avoid clogs in the meters.
2. Install the solenoids and meters in the fluid and air systems.
3. Set the control module addresses with the DIP switches and label each
control module.
4. If the electrical input is 240 VAC, rewire the transformer.
5. Mount each control module and keypad bracket in its assigned location.
Cable Routing and Connection
Installation Steps
6. Route and connect the AC power to each control module. Do not turn on
the power yet!
7. Route the solenoid and meter cables to their assigned control module.
8. Connect each solenoid and meter cable to the proper connector/port in the
assigned control module.
CAUTION:
will be damaged.
9. Route the CAN network cable between the control modules. Connect the
cable to the proper control module connectors. Remove the terminating
resistor from the connectors of the control modules that are in the middle of
the network chain.
10. Route and connect the keypad cables between the keypads and the control
modules.
11. Route and connect the printer or computer cable between the Master Control
Module and the printer or computer.
12. Visually check that all wiring is connected correctly. Compare the wiring to the
diagrams in this manual.
6
308–607

Installation Checklist

Observe the proper polarity of meter connections or the meter
Reference
Floor plan, Appendix
(pages 67–69), and
solenoid and meter
manuals
Floor plan and
page 8
Page 9
Floor plan and
page 10
Reference
Floor plan and
page 11
Floor plan
Floor plan and
page 12
Floor plan and
page 13
Floor plan and
page 14
Page 14
Pages 11–14

Advertisement

Table of Contents
loading

Table of Contents