Graco HORIZON Instructions-Parts List Manual page 5

Fluid management systems
Table of Contents

Advertisement

Pre-installation Checklist
Pre-installation Steps
7. Repeat the following steps for each control module:
a. For each solenoid attached to the control module, assign one port num-
ber, from 1 to 6. Record the port number and whether it is an air or fluid
solenoid on the Floor Plan. NOTE: Air and fluid solenoids can be inter-
mixed on the Horizon ports.
b. For each meter attached to the control module, assign one port number,
from 7 to 12. Record the port number on the Floor Plan. NOTE: More
than one dispense point (reel, oil bar, hose, etc.) can share a meter.
CAUTION: Record all the information carefully as it must be accu-
rately entered during software setup.
8. Record the system data from the Floor Plan to the corresponding Pre-instal-
lation Forms. The completed forms will ease system setup by placing the
information in the order the software will request the input. To ease software
setup, keep the items in numerical order.
Pre-installation Forms
Form #1:
User Name, PIN Number, and Access Level
Form #2:
Control Module and Fluid: Names and Numbers
Form #3:
Dispense Area Names and Numbers
Form #4:
Connection Assignments
Form #5:
Meter Calibration Chart
Form #6:
Warranty Registration and Checkout Form
9. Make sure the following tools are available for the system installation:
Drill, drill bit, and anchors to mount the control modules and keypad
brackets on the walls or beams
Wire cutter
Wire stripper (wire gauge ranges between 18 and 22 AWG)
Small, slotted screwdriver
VOM (volt-ohmmeter) or multimeter to check cable continuity, input
voltage, etc.
10. You are now ready to install the system. See the Installation Checklist on
page 6.
Reference
Floor Plan
Floor Plan and Forms
1–6; see examples of
forms on pages 56–66
308–607
5

Advertisement

Table of Contents
loading

Table of Contents