9.10.4
Commissioning
9.10.5
Maintenance display
9.10.6
FAT procedure
Flushing, drainage, pressure build-up process times can be
checked and changed
Display of the time to the next maintenance.
n
Then continue with commissioning
n
Access only for internal checks in the manufacturer's factory.
Operation of the system
67