Start-Up: Comfort Version - ProMinent DULCODOS ULIa Assembly And Operating Instructions Manual

Polymer preparation system
Table of Contents

Advertisement

Flow display
With post-dilution
10.9

Start-up: Comfort version

1 Operating mode
2 Calibration of the liquid concen‐
trate pump
3 Concentration
4 System output
5 Rinsing and drainage process
Operating mode
Status bar
Status bar
6 Pressure build-up
Status bar
Setpoint and measured value converge after a delay time
When post-dilution is installed, the max. output of 400 l/h of the pre‐
pared polymer solution is taken from the main line and the remaining
volume of raw water is automatically adjusted using the control valve
VC2
Pre-conditions:
All connectors connected at the inlets and outlets.
n
Main switch on.
n
Pressure on the display of the unit / PI 1 / left corner of the HMI
n
< 6 bar.
Pause function not enabled / jumper to terminals or external
n
signal.
OFF
Ä Chapter 9.7.1 'Calibrating the metering pump'
Calibration tab
on page 62
Control tab Fig. 38
Adjust the internal setpoint or external mA signal, check/change the
active ingredient.
Ä Chapter 9.6.2 'Option: Capacity/System output'
Control tab
on page 61
Adjust the internal setpoint or external mA signal.
Automated function.
AUTO
StartUp flushing of mixer, water to drain.
Solenoid valve V1 opens for approx. 15 minutes.
Control valve VC1 regulates to max. flow.
Motorised valve V2 opens and V3 closes.
Approx. 110 litres are flushed through.
Solenoid valve V1 and control valve VC1 close automatically.
StartUp draining of mixer
Solenoid valve V1 closes.
Control valve VC1 closes.
Motorised valve V2 remains open and V3 closed.
The mixing chamber is drained after approx. 240 seconds.
Start of pressure build-up.
Solenoid valve V1 opens.
Control valve VC1 opens to approx. 50%.
Motorised valve V2 closes and V3 remains closed.
Operating modes
75

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dulcodos ulia 400 basicDulcodos ulia 400 mediumDulcodos ulia 400 comfort

Table of Contents