Preparing The Library For Operation - Quantum P3000 Series User Manual

Automated tape library
Table of Contents

Advertisement

Appendix B Relocating the Library

Preparing the Library for Operation

Preparing the Library for Operation
98
After shipping or moving the library, refer to the ATL P2000/
P3000/P6000 Pre-Installation Site Survey Instructions and the ATL
P3000 Series Unpacking Instructions to:
• Prepare the new installation site
• Receive the library
• Uncrate the library (required in shipping the library)
• Position the library
• Prepare the library for operation
Quantum|ATL P3000 Series User's Guide
2

Advertisement

Table of Contents
loading

Table of Contents