Chapter 3 Installing the Library
Preparing the Library for Operation
Preparing the Library for Operation
32
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
After the library is installed and connected to the host, you can
perform the procedures listed below as needed to prepare the
library for operation.
For a description of how to perform these procedures, refer to the
Quantum|ATL 7100 Series Tape Library Operator's Guide.
• Defining the library power-up state
• Enabling/disabling the auto clean option
• Enabling/disabling the auto load option
• Setting the language used for the status display area
• Enabling/disabling 4/52 identity mode
• Loading the library with cartridges (either through the load
port or by bulk loading of cartridges through the storage array
door)
• Performing an inventory
• Turning the interior light on or off
3