Quantum P3000 Series User Manual page 115

Automated tape library
Table of Contents

Advertisement

If you are moving the library within a facility, refer to
the Library for Operation
To crate the library for a new site:
The library weighs approximately 1300 pounds (591
Warning:
kg). Use at least two people to perform any steps that
involve lifting or guiding the library. Use safe
practices when lifting or guiding the library and
handling the ramp.
Prepare the shipping pallet for the library as shown in
1
figure
50.
Attach the two ramp extensions to the pallet.
a
Place the wooden support bar underneath the ramp
b
extensions.
Verify that the left wooden bar is attached to the pallet.
c
Place the library on the pallet
2
Raise the library support feet.
a
With the help of at least one person, roll the library to a
b
position in front of the pallet ramp.
Roll the library onto the pallet.
c
Secure the library.
3
Place the shipping bag over the library, and secure it into
a
place.
Remove the ramp sections from the pallet and slide them
b
into the center section.
Insert the foam block around the bottom of the library and
c
the pallet.
Insert and attach the stop blocks underneath the library on
d
the right side.
Attach the wooden bar on the right side of the library.
e
Remove the wooden bar on the left side of the library.
f
Quantum|ATL P3000 Series User's Guide
Appendix B Relocating the Library
on page 98.
Crating the Library
Preparing
95

Advertisement

Table of Contents
loading

Table of Contents