Pinch both flaps on the side of the handles.
Align the handles with the 6 posts on the sides of the server; then slide the handles up to secure them
to the chassis.
Notes:
• Make sure all 6 posts are secured.
• There are 4 lift handles in total. Make sure to install them all properly before lifting the server.
Step 7.
Install the server to the rack.
a.
Align both rear ends of the inner rails with the openings in the intermediate rails, and make sure
the two pairs of rails mate correctly. Then, carefully slide the server into the rack until the rails
snap into place.
Attention: When moving the server, hold
the server by its lift points or the lift
handles at all time.
.
Chapter 5
Hardware replacement procedures
69