Power-Up Procedure

To power up the CSACS 1120 Series appliance and verify its initialization and self-test, follow this
procedure. When the procedure is completed, the appliance is ready to be configured.
Review the information in
Step 1
Plug the AC power cord into the power cord receptacle at the rear of the appliance. (See location 1 in
Step 2
Figure
Connect the other end of the power cord to a power source at your installation site.
Step 3
Press the power button on the front of the appliance. (See location 2 in
Step 4
The appliance should begin booting. Once the operating system boots, you are ready to initialize the
basic software configuration.
Figure 3-8
The following table describes the callouts in
1
2
3

Checking the LEDs

When the CSACS 1120 Series appliance is up and running, observe the front-panel LEDs. The following
LEDs provide power, activity, and status information:
CSACS 1120 Appliance Front-Panel LEDs
OL-19455-01
Safety Guidelines, page
3-7.)
CSACS 1120 Series Appliance Front View
1
2
USB port
Power button
Appliance power LED
Appliance power, green:
On when power is on.
Off when power is off or an error condition has been detected in the operating voltages.
2-1.
4
6
3
5
Figure
3-8.
4
Hard disk drive activity LED
5
NIC 1 LED
6
NIC 2 LED
Installation Guide for the Cisco 1120 Secure Access Control Server 4.2
Powering Up the CSACS 1120 Series Appliance
Figure
3-8.)