7 Communications
Operation Stop State Transition Command
This command moves you to the Initial Setting Level where operations are stopped and can be
accepted on the Operation Level or Adjustment Level where operations are performed.
In order to set the setting values on the Initial Setting Level or Communications Setting Level, you need
to enter the operation stopped state.
To resume operation, the power ON reset process is required.
The power ON reset process can be executed by the following operations.
•
Cycling the power supply
•
Executing the Software Reset Command via communications
•
Moving to the Operation Level with key operations (by pressing the Level Key for 1 second or more in
the operation stopped state)
Alarm Latch Cancel Command
Turns OFF the latched alarm status.
When an alarm occurs, it is in the latched (retained) state. The alarm is unlatched when this command
is sent with the measurement value falling short of the alarm value.
7 - 8